
No building load to feed
Park & ride facilities, beach and mountain car parks, standalone car parks and office car parks where the building uses little energy offer no load for a conventional system to supply.
Direct solar-to-EV charging
Indergy builds charging points that connect solar canopies directly to electric vehicles. No electricity grid. No external storage. Energy flows from the sun into the car's battery.
With direct solar-to-EV charging, the parked electric cars become the load for a solar canopy, so it needs neither a grid connection nor an external battery. Installers build the canopy just as they would any other PV system, while Indergy sizes it and supplies the charge points.
How it works
Each system consists of a solar canopy over the parking spaces, a DC/DC converter that follows the output of the array, and charge points that pass the energy on to the cars as it is generated.

The modules are mounted over existing parking spaces, on a structure and foundations like those of any solar carport. The ground underneath remains unchanged, and parked cars are shaded from the sun.

Instead of an inverter, a DC/DC converter takes the DC output of the array and matches it to the voltage of the car's battery, delivering as much power as the battery can accept at that moment.

The car's battery is the only storage in the system. The car charges with the power the sun delivers while it is parked, so no energy needs to be buffered or fed into the grid.
A new market
Self-consumption projects need a building with a meter, a load and a roof. Many car parks lack these, which is why they have never been part of a typical solar offer. With direct solar-to-EV charging, the parked cars themselves become the load, and these car parks become viable projects.

Park & ride facilities, beach and mountain car parks, standalone car parks and office car parks where the building uses little energy offer no load for a conventional system to supply.

The canopy can be built without the grid operator's approval and without paying a connection fee. This also opens up sites where the local grid has no capacity left.

Some car parks are so far from the building that trenching and cabling back to the meter would never pay off. A self-contained canopy avoids this cost entirely.
For solar installers, these projects add a new line of business alongside their self-consumption work.
The project
Modules, mounting structure, foundations and maintenance work just as they do in a self-consumption project. Only two components are different:
What we offer
Most projects begin with a simulation of a specific car park. From there, our charge point and our consulting services support the project all the way to a finished site.
We determine how large the canopy should be, how many charge points it needs and what the project is worth. For installers, the simulation of their first car parks is free of charge.
Learn more about sizing Pre-orders starting soonOur DC/DC charge point replaces both the inverter and the grid connection. It is currently in development.
Learn more about the charge pointWe offer feasibility studies, site screening and technical concepts for EV charging without a grid connection.
Learn more about consultingPilot sites
We are looking for installers who would like to build the first grid-free car parks together with us. There are three ways to get involved.
The installer brings a car park that falls outside their current offer. We size the system, the installer builds it, and we measure its output hourly against the simulation. The finished site then serves as a reference for future clients.
Talk to us about a pilotInstallers who plan to offer grid-free car parks tell us roughly how many charge points they could install per year. We start with a short call, followed by a non-binding letter of intent.
Discuss pre-ordersAnyone interested can receive regular updates as the development of the charge point progresses, as well as the preliminary data sheet on request.
Get updatesThe DC/DC charge point is currently in development, and all technical documents are preliminary.
Why grid-free
Many of Europe's electricity grids are already operating at capacity. According to the European Commission, obtaining the permits to reinforce a grid can take 4–10 years. Because our canopies charge cars directly, they require no grid connection and are not affected by these waiting times.
They also continue to charge during a power outage, such as the blackout that affected Spain and Portugal on 28 April 2025.
Source: European Commission, Grids, the missing link, COM(2023) 757
All we need is the location, the number of parking spaces and the type of car park. In return, you receive the recommended canopy size in kWp, the number of charge points, the share of charging demand met, the project value and the expected return for the site owner.
Are you a site owner, operator or investor?
Please write to hello@indergy.com